Ελληνικά / English
Tuesday, 26 September 2017
1
 

Quick Search

 

Quick Links

RES Penetration Data



RESPENBANNER



 Conferences



5th Inernational RES & Energy Efficiency


 

For Authorised Users only

Authorised Users are those approved by the Cyprus TSO as Market Participants.

 

 
 

Contact Us

TSO Building



Evangelistrias 68,

CY-2057 Strovolos

Cyprus



To locate us





Tel: +357 22 611 611

Fax:+357 22 611 666


 
Contact Information
 
Αλλαγή Γλώσσας

Welcome

You have entered the website of the Cyprus Transmission System Operator of Electrical Energy (Cyprus TSO).

The Transmission System Operator Cyprus was established following the decision of the Government of the Republic of Cyprus to apply the relevant European Directive for liberalising the Electricity Market >>>

Banners

   em-banner.gif                                     eProcurement_gr 


 

Announcements

     

     

    More announcements

  • CONSULTANCY SERVICES TO ASSIST IN THE IMPLEMENTATION OF THE NET POOL MODEL FOR THE CYPRUS ELECTRICITY MARKET
    The Transmission System Operator Cyprus (TSOC) is conducting an open tender procedure using as an award criterion the most economically advantageous tender based on the best price – quality ratio per consultant, for an Economic Operator to provide consulting services of one or more experts, to assist in the implementation of the Net Pool model for the Cyprus Electricity Market. >>>
  • Cyprus Electricity Energy Mixture for 2016
    30/5/2017 - The Cyprus Transmission System Operator, applying Cyprus Energy Regulating Authority (CERA) Decision 1279/2015 on the Calculation Methodology of the Electricity Energy Mixture of Cyprus and the Energy Mixture of Suppliers, publishes with this announcement... >>>
  • Cyprus Electricity Energy Mixture for 2015
    The Cyprus Transmission System Operator, applying Cyprus Energy Regulating Authority (CERA) Decision 1279/2015 on the Calculation Methodology of the Electricity Energy Mixture of Cyprus and the Energy Mixture of Suppliers, publishes with this announcement... >>>
 
 

 Announcements List  >>>


News

Jun. 1,

 

More News

 
 

News Releases List  >>> 

Quick Links

 
 
 
 

Daily System Generation on the Transmission System (MW)

 


 

26/09/2017

     Actual Generation (MW)
     Generation Forecast (MW)
     Wind Farms Generation (MW)
     Total Available Generation Capacity (MW)

Graph Enlargment


 
Past Dates
 

Daily Wind and Solar Farms Generation (MW)

26/09/2017

     Wind Farms Generation (MW)
     Solar Farm Generation (MW)
NOTES: 


1) The Generation from Wind Farms is injected to the Transmission System and the generation from PV Parks to the Distribution System


2) The Generation from PV is estimated


Graph Enlargment


 
Past Dates
 

Unplanned Interruptions of Electricity Supply

 



 


 
Full List
 

- Only Interuptions lasting over half an hour are reported.

- Interruptions to the Low Voltage networks are not reported.



 

 

Maintenance Schedule

Υποστ. ΛΑΡΝΑΚΑ - Συντήρηση στο Σύστημα Μεταφοράς
Εικοσαετής Συντήρηση διακοπτών 132kV CB SIEMENS TYPE 3AQ1
From 25/09/2017 08:30 To 03/10/2017 13:00
 
 
 
© 2017 Copyright Transmission System Operator, Cyprus